If continuity is present as described, reconnect the
wires to the dispense valve(s) and proceed to #7
If continuity is not present as described, replace the
dispense valve.
7. Check the dispense valve for coil action. Connect
the brewer to power source. Place the ON/OFF"
switch in the "ON" position, press and release the
start switch. Listen carefully in the vicinity of the
dispense valve for a "clicking" sound as the coil
magnet attracts and repels the plunger.
8. Disconnect the brewer from the power source.
If the sound is heard as described, there may be a
blockage in the dispense valve or the water line to the
dispense valve. Remove the dispense valve and in-
spect for wear, and remove waterborne particles.
If the sound is not heard as described, replace the
dispense valve.
Removal and Replacement:
1. Drain enough water from the tank so the dispense
valves are above the water level.
2. Disconnect wires and water tubes from dispense
valve.
3. Remove dispense valve from the sprayhead panel.
4. Install new dispense valve.
5. Reconnect the water lines and the wires to the
dispense valve.
6. Refer to Fig. 11 when reconnecting wires.
P782
FIG. 11 DISPENSE VALVE TERMINALS
DISPENSE SOLENOID VALVES
Location:
Dispense valves are located inside the hood in
the center of each sprayhead panel.
Test Procedures:
1. Disconnect the brewer from the power source.
2. Disconnect the wires from the right dispense valve
and check the voltage across the white wire and
white/red wire. Connect brewer to the power
source. Place the "ON/OFF" switch in the "ON"
position, press and release the start switch. The
indication must be 120 volts ac for three wire 120/
208 volt models and three wire 120/240 volt
models.
3. Disconnect brewer from the power source.
4. Disconnect the wires from the left dispense valve
and check voltage across the white wire and the
white/green wire. Connect the brewer to the power
source. Place the "ON/OFF" switch in the "ON"
position, press and release the start switch. The
indication must be 120 volts ac for three wire 120/
208 volt models and three wire 120/240 volt
models.
5. Disconnect brewer from power source.
If voltage is present as described in steps 2 & 4
proceed to #6.
If voltage is not present as described, refer to the
wiring diagrams and check the brewer wiring harness.
6. Check for continuity across the dispense valve coil
terminals.
FIG. 10 DISPENSE VALVES
P2232
SERVICE (cont.)
32248 100500
WHI to right By-pass Solenoid
WHI/RED to DBC Controller J1-1
WHI to left By-pass Solenoid
WHI/GRN to DBC Controller J1-9