Bunn Dual TF DBC With Smart Funnel DUAL068000 Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Kávovary Bunn Dual TF DBC With Smart Funnel DUAL068000. Bunn Dual TF DBC With Smart Funnel DUAL068000 User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 10
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
DUAL
®
TF
DBC
®
WITH SMART FUNNEL
®
S/N DUAL068000 & UP
INSTALLATION & OPERATING GUIDE
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit
the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain
the latest catalog and manual updates. Contact Bunn-O-Matic Corporation at 1-800-286-6070 to obtain
a paper copy of the required Illustrated Parts Catalog mailed via U.S. Postal Service.
35058.0002C 5/12 ©2010 Bunn-O-Matic Corporation
Zobrazit stránku 0
1 2 3 4 5 6 7 8 9 10

Shrnutí obsahu

Strany 1 - WITH SMART FUNNEL

DUAL®TF DBC®WITH SMART FUNNEL®S/N DUAL068000 & UPINSTALLATION & OPERATING GUIDEBUNN-O-MATIC CORPORATION POST OFFICE BOX 3227SPRINGFIELD, ILLIN

Strany 2 - INTRODUCTION

Page 10CLEANING1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic

Strany 3 - MAIN ON/OFF

Page 2BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTYBunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows:1) Airpots, thermal carafes

Strany 4 - USER NOTICES (cont.)

Page 300656.000100831.000000658.0000USER NOTICESThe notices on this brewer should be kept in good condition. Replace unreadable or damaged labels.378

Strany 5 - ELECTRICAL HOOK-UP

Page 4ELECTRICAL REQUIREMENTS (Models with power cord)WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up

Strany 6 - CE REQUIREMENTS

Page 5120/208 and 120/240 volt acsingle phase, 60 Hz modelsNote: This electrical service consists of 3 current carrying conductors (Neutral, L1 and L2

Strany 7 - OPERATING CONTROLS

Page 6PLUMBING REQUIREMENTSThis brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kPa) from a

Strany 8 - (-) DONE (+)

Page 7bbccddefgOPERATING CONTROLS OPERATING CONTROLS (a) MAIN ON/OFF SWITCH This switch, located under the brewer behind the front leg, turns power o

Strany 9 - SET READY: XXX°

Page 8INITIAL SETUPCAUTION – The brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructi

Strany 10 - CLEANING

Page 9SET READY - Range: 185˚F (85˚C) to 203˚F (95˚C) This function allows the operator to set the minimum temperature allowable to start a brew cycl

Komentáře k této Příručce

Žádné komentáře